Work continues on both the exterior and interior of the building. The exterior is being bricked in and insulated. Duct work, ceilings and sheet rock are being placed inside. Windows are being installed with hopes of entirely sealing in the building soon. Progress is going well.

Click through slideshow below.

Crosses
« of 6 »